Quick Turnaround – Turnkey Pump Station Equipment

Quick Turnaround – Turnkey Pump Station Equipment

Quick Turnaround – Turnkey Pump Station Equipment ProblemSolutionTestimonial A completed apartment complex needed an additional pump station for overflow from the nearby station. With time of the essence as the buildings were already occupied, the new Usemco Top...
Wastewater Treatment Plant – Delaware County, PA

Wastewater Treatment Plant – Delaware County, PA

Wastewater Treatment Plant – Delaware County, PA ProblemSolutionTestimonial Original, 28 year old, RAS pumps became maintenance intensive due to the shaft drive design.  In addition, pump part lead time was excessive and expensive.  The overall system reliability was...
Convert Old, Unreliable 1PH to 3PH System to New USEMCO System

Convert Old, Unreliable 1PH to 3PH System to New USEMCO System

Convert Old, Unreliable 1PH to 3PH System to New USEMCO System ProblemSolutionTestimonial The municipality had continuing problems with an old roto-phase system that was running higher HP (15HP) grinder pumps in a residential area that had no 3ph available and asked...
Low to High Flows Automatically – Turn Key

Low to High Flows Automatically – Turn Key

Low to High Flows Automatically – Turn Key ProblemSolutionTestimonial Washington Borough experiences an excessive amount of infiltration during rain events.  An undersized wet well, and pumps within the existing pumping station could not handle the high flows during...
(5) 450HP Blower Project in 18MGD Plant Expansion

(5) 450HP Blower Project in 18MGD Plant Expansion

(5) 450HP Blower Project in 18MGD Plant Expansion ProblemSolutionTestimonial The City was undergoing a massive upgrade and conversion of their process, which required a significant amount of aeration capacity, while keeping energy and maintenance cost to a minimum....