
Townhouse Community Sewage Pump Station Retrofit
An undersized sewage pump station that used pumps built for single family homes clogged frequently. The low pumping rate allowed rags and solids to accumulate in the basin, requiring frequent vacuum truck pumping to keep the system operational. The system finally failed and needed to be repaired.
One of Reiner Pump’s service partners installed Franklin Electric 2HP engineered grinder pumps. They were able to use the existing basin and modify the controls, saving the owner time and money. The pumps have never clogged and routine basin cleaning is not required. – Neptune, NJ
Case Study – City of Chehalis
Upgrade to HST™ turbocompressor yields energy and treatment improvements A case study in how replacing a critical positive displacement blower with a Sulzer HST turbocompressor results in significant efficiencies and a facility upgrade. [pdf-embedder...