Pump station owner/operator experienced major clogging events every 1-2 hours during storms.
Replace with Sulzer-ABS’s ContraBlock Plus impeller system and closed-loop cooled 50HP motor. Solved mechanical piping challenges by installing the pump horizontally. – Luzerne County, PA
Owner: “We became believers from some other projects that Reiner Pump Systems did for us. RPS Territory Managers were instrumental in helping us solve this stations problems as they have done for us before. We are very satisfied with the results and will be replacing the other pump as well. “
They did in 2017.
Case Study – City of Chehalis
Upgrade to HST™ turbocompressor yields energy and treatment improvements A case study in how replacing a critical positive displacement blower with a Sulzer HST turbocompressor results in significant efficiencies and a facility upgrade. [pdf-embedder...