Skagit County WA, upgrade LS to a PumpMate
The customer’s on site wastewater treatment plant was to be upgraded, requiring pumps in their main lift station to be upgraded with higher total performance. The customer’s original wet well was built with internal check valves, no guide rails and single-phase power. Customer desired to refurbish the existing wet well to accommodate a new duty point and improve their overall experience.
Using the USEMCO Pump Mate, Reiner Pump Systems was able to coordinate refurbishment of the existing wet well without excavation of a new wet well or added space required of a BG valve vault. The new system provided the customer with non-proprietary guide rail system, above ground check/isolation valves, emergency bypass port and three phase power. New system upgrades capability of the pumps and eliminates the need for confined space entry to service.
On behalf of [end user], I would like to send out a BIG Thank You for a job well done! Although this project presented some challenges, you all worked together from planning to completion and made it look easy! I was very impressed with the leadership, teamwork, and collaboration between Reiner Pump Systems, [General Contractor], and [Electrical Contractor], in streamlining this project along!
From tackling the unknowns and the unexpected, to regrouping and facilitating strategies, you all managed to stay on course and get it done within the original time frame! There is no substitute for experience, and you all have proven to possess the talent, skills and expertise needed to do it right the first time!
To each of you, and to all that were doing the actual work, take a bow guys! Well done!!