Large Water Supply Project

Large Water Supply Project

Large Water Supply Project ProblemSolutionTestimonial The Village of Kiryas Joel, NY needed water for their growing community and fast.  They were trucking in water to meet demand Their consulting Engineer started designing the project, then thought that pre-packaged...
Sulzer ABS XFP in Sewer

Sulzer ABS XFP in Sewer

Sulzer ABS XFP in Sewer ProblemSolutionTestimonial Customer in a Burlington County Sewer Department, NJ was experiencing reliability issues at their main pump station utilizing a channel impeller pump. Customer was seeking relief from clogging and unreliable pumps...
RAS/WAS Retrofit

RAS/WAS Retrofit

RAS/WAS Retrofit ProblemSolutionTestimonial Existing RAS and WAS pumps were unreliable and had excessive lead time for parts and/or replacement pumps. Reiner Pump Systems worked directly with the township to provide replacement Sulzer ABS Drypit Submersible pumps that...
The New Standard in Pre Packaged Pump Stations

The New Standard in Pre Packaged Pump Stations

The New Standard in Pre Packaged Pump Stations ProblemSolutionTestimonial Existing pump station building in disrepair with unreliable and clog prone pump. Customers’ previous build in place pump station at another location had multiple delays during construction and...
Engineered Solution Using Tigerflow

Engineered Solution Using Tigerflow

Engineered Solution Using Tigerflow ProblemSolutionTestimonial Consulting Engineer contacted us with a problem with a vendor that could not provide an engineered solution that they needed, and fast. RPS worked with the Engineer and Tigerflow to come up with an...

Pin It on Pinterest