Win-Win

Existing top-tier pumps kept clogging in Sussex County.  This also lead to comminutor motor flooding repairs.

Sulzer-ABS pumps solved the clogging problem completely approx. 4 years ago, and when the comminutor needed service again, the operators remembered RPS telling them that the comminutor was not needed with ABS pumps.  So they removed the comminutor completely and the station is still clog free.  Win-win, no clogs, no comminutor expense.

“When the comminutor eventually failed again we decided to try running the wet well without the grinder.  That was 4 years ago and since then we haven’t had any clogs or issues.  We have been thoroughly pleased with the results of these ABS pumps and plan on replacing the pumps in our other locations with them as needed.”

Cloacina: Pursuit of Excellence

https://www.cloacina.com/pursuit-of-excellence

Case Study – City of Chehalis

  Upgrade to HST™ turbocompressor yields energy and treatment improvements A case study in how replacing a critical positive displacement blower with a Sulzer HST turbocompressor results in significant efficiencies and a facility upgrade.   [pdf-embedder...

Sulzer BABA

We are excited to share with you our newest promotional flyer highlighting Sulzer's BABA capabilities. In the coming weeks, we'll be launching a dedicated landing page on sulzer.com, accompanied by a digital campaign. We encourage you to share this flyer with your...

New Location in the Pacific Northwest

Reiner Pump Systems is excited to announce that we are opening our first new office/warehouse in the Pacific Northwest region! As we get our new location online, we will be ramping up the availability and stock levels of Sulzer-ABS, Usemco, and Franklin Electric...

ABS Pumps will be BABA compliant Q1 2024 with short leadtimes.

Coming into the first quarter of 2024, ABS pumps will be BABA compliant with a short lead time.

Pin It on Pinterest