
USEMCO Top Vault in Schuylkill County, PA
The USEMCO Top Vault was selected by the contractor due to its low-cost and quick delivery. Sulzer-ABS Piranha grinder pumps were installed as part of the package. The existing fiberglass pit was left in place, a small concrete pad was poured to help support the Top Vault, and all fencing and panels were removed.
“The Top Vault was a pleasure to install with its simple, lightweight design. Engineering and design were easy to navigate, delivery was outstandingly quick, and Reiner’s support was consistently excellent from start to finish. A year later, and we have never re-entered the pit. ABS’s single guide rail make pulling the pumps a breeze; all other components are above ground. And this was all for a fraction of the cost and effort of a full-blown upgrade.” – Site Contractor
Request More Info
A Reiner Pump Systems Salesperson will call you to discuss your project requirements and develop a solution.
Sulzer BABA
We are excited to share with you our newest promotional flyer highlighting Sulzer's BABA capabilities. In the coming weeks, we'll be launching a dedicated landing page on sulzer.com, accompanied by a digital campaign. We encourage you to share this flyer with your...