Main Effluent Pumps at Caldwell WWTP

During construction of a large upgrade the existing main effluent pumps, which were not part of the contract, were found to not be performing adequately.  This was determined to affect the entire upgrade project.  However, they needed these existing pumps fixed or replaced fast.

Reiner Pump was tasked with getting new pumps fast.  We selected National Pump Company’s 24 inch vertical turbine pumps for 5200gpm.  Delivery was on-time and commissioning was quick and successful.  Vibration was measured at less than 1mm/s (which means you can barely tell that they are on).

SEEPEX Virtual Reality App

Reiner Pump is excited to be working with SEEPEX, a leading worldwide specialist in pump technology. SEEPEX offers a new, free app - SEEPEX VR - so users can see SEEPEX’s patenting Smart Conveying Technology and pump portfolio in virtual and augmented...

600,000 gpm Pumps in New Orleans

We were not a part of this project, but we just wanted to show you a unique project that Patterson Pump did for the ongoing Army Corp of Engineers projects in New Orleans. We don’t know the details other than Jamie, Craig and I were at Patterson’s plant in Georgia...

Sulzer ABS XFP pump with Contrablock impeller solves reliability and clogging problem

Customer at Burlington City Sewer Department , NJ was experiencing reliability issues at one of their main influent pump station utilizing a channel impeller pump. Customer was seeking relief from clogging and unreliable pumps. An ABS XFP pump with a Contrablock...

Energy Savings at the Township of Neptune Sewage Authority

Facility Description The Township of Neptune Sewerage Authority (TNSA) owns and operates a wastewater treatment plant located in the Township of Neptune and provides wastewater treatment for Neptune Township, Wall Township, Avon by the Sea, Bradley Beach, Neptune...

Pin It on Pinterest